首页 社会内容详情
约搏单双游戏(www.eth108.vip):More development projects in Sarawak

约搏单双游戏(www.eth108.vip):More development projects in Sarawak

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

约搏单双游戏www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,约搏单双游戏数据开源、公平、无任何作弊可能性。

Sarawak Premier Tan Sri Abang Johari Tun Openg (second left) looking through a coffee table book in conjunction with the Sarawak Economic Development Corporation's 50th anniversary celebration on Monday (July 4)(File pic)

PETALING JAYA: The prospects of the construction sector remains bright in Sarawak following more development projects in the pipeline, says MIDF Research.

The state government is projecting a capital injection of RM100bil by 2028 in its efforts to achieve a developed economy status.

“About RM64bil will come from the state’s annual budget, while the state’s energy development company Sarawak Energy Bhd is expected to pump in about RM40bil up to 2026,” said the research house in its note to clients.

This is a conservative estimate by Sarawak as the state’s budget averages about RM10bil annually, said MIDF Research.

In addition, investments that would involve several billion ringgit from Japan-based Sumitomo Corp and South Korea-based Samsung in the state’s first hydrogen plant, are expected to begin construction this year, said the research house.

Sarawak is also focusing to look into “sick projects” that were delayed or abandoned.

MIDF Research said this would mean more infrastructure works are expected to be rolled out in the state.

“About 84 sick projects have been identified in Sarawak and among action plans to tackle them are to appoint rescue contractors.

,

皇冠登录线路www.hg108.vip)实时更新发布最新最快的皇冠手机网址、皇冠手机网址线路、皇冠手机网址登录网址、皇冠手机网址管理端、皇冠手机网址手机版登录网址、新2手机皇冠登录网址。

,

“This could suggest that a number of projects would be retendered – a good opportunity for construction players to replenish their order books,” said the research house.

At the same time, Sarawak remained committed to reimplement projects shelved in 2018.

The research house said tenders for the state-funded second trunk road, which spans 225km, are expected to be called this year, with seven work packages.

“There will be seven more packages next year,” it said, adding that the entire project is estimated at RM5.84bil.

Another closely watched plan is the post Covid-19 development strategy where Sarawak has committed RM63bil for various efforts such as to develop basic infrastructure, namely roads and bridges, water and electricity supply, and telecommunication network.

In June, the state government had said that 7,530km of new roads would be built to connect all rural areas, while 3,487km of roads must be upgraded or rehabilitated.

“This would translate into strong job flows over the long term,” said MIDF Research.

On Tuesday, Sarawak premier Tan Sri Abang Johari Tun Openg said the state government is finalising a programme to assist construction players, which will focus on the prices of raw materials.

“While this is not a massive headwind for most of the companies under our coverage, this is a much-welcomed move for the industry in mitigating the downside risks,” the research house noted.

  • 一切?都与我无关 @回复Ta

    2022-10-02 00:04:47 

    第14分钟,维基诺维奇右侧角球开出,周通后排插上射门,将球踢飞。第18分钟,维基送出精准长传,禁区内的苏缘杰转身回传,赵英杰怒射,被邵镤亮神勇扑出。心情好好啊,赞

发布评论